Article 4 direction area
There is a problem
- 78 issue of type invalid category value
Evelyn Court LSIS
- reference
- Eve3
- name
- Evelyn Court LSIS
- article-4-direction
- permitted-development-rights
- Class e
- uprns
- address-texts
- geometry
- MULTIPOLYGON (((-0.036524 51.486422,-0.036006 51.486002,-0.035790 51.486099,-0.035627 51.486189,-0.035516 51.486304,-0.035651 51.486411,-0.036102 51.486679,-0.036373 51.486492,-0.036524 51.486422)))
- point
- POINT (-0.03601 51.486339)
- notes
- entry-date
- 2026-02-25
- start-date
- end-date
How to fix this issue
Your data is missing a permitted-development-rights.
The Article 4 direction area guidance explains how to fix the issue:
permitted-development-rights
A list of the permitted development rights withdrawn by the article 4 direction.
Separate the rights in the list using semicolons.
Only use rights from our permitted development right dataset. If the area withdraws a permitted development right that is not in our dataset, email digitalland@communities.gov.uk.
Example: 3D;3M;11B
How to improve London Borough of Lewisham’s data
- Fix the errors indicated
- Use the check service to make sure the data meets the standard
- Publish the updated data on the endpoint URL